customer | short description | amount | power | combustible | |
---|---|---|---|---|---|
2018-02-08 | Getec AG Magdeburg, HH Turek, Poland | Flame tube boiler Hot water, 6 bar, 160°C |
2 | 13,7 MW | Pulverised lignite |
2017-02-27 | Getec AG, HH Schoellershammer, Düren | Flame tube boiler 22 bar, 217°C |
2 | 9,95 MW 13,95 t/h (steam power) |
Pulverised lignite |
2016-06-01 | Getec AG, HH Weylchem at Griesheim | Flametube boiler, steam 21 bar, 217°C |
2 | 9,75 MW 13,5 t/h (steam power) |
pulverised lignite / natural gas |
2015-03-18 | Getec AG, HH Philippine Engineering Plastics, 56112 Lahnstein | Flame tube, saturated steam 8 bar, 175°C |
1 | 9,3 MW 13 t/h (steam power) |
Pulverised lignite |
2013-08-01 | Getec AG, Magdeburg HH Radici, Zeitz | Dual flame tube Saturated steam 22 bar, 220 °C |
1 | 2x9,1 MW 27,8 t/h (steam power) |
Pulverised lignite |
2013-07-01 | Getec AG Magdeburg, Trebsen Papierfabrik | Dual flame tube Saturated steam 22 bar, 220°C |
1 | 2x9,1 MW 27,8 t/h (steam power) |
Pulverised lignite |
2011-11-08 | Allessa Chemie Gmbh in Frankfurt a. M. | flame tube boiler Superheated steam / electricity; 23,5 bar |
2 | 10 MW 12,3 t/h (steam power) |
Pulverised lignite / lean gas |
2010-06-01 | Getec AG, Magdeburg Xella Köln-Porz | Saturated steam 20 bar 215 °C |
1 | 6,6 MW 10 t/h (steam power) |
Pulverised lignite |
2005-12-5 | Getec AG, Magdeburg HH Isola GmbH Düren | Hot water 15 bar 186°C |
1 | 4 MW - t/h (steam power) |
Pulverised lignite |
2005-05-10 | Getec AG, Magdeburg HH SMS Demag | Hot water 10 bar 130°C |
1 | 4 MW - t/h (steam power) |
Pulverised lignite |
A.W. Andernach KG, Bonn | Dual flame tube Saturated steam 17 bar, 207 °C |
1 | 2x5 MW 12 t/h (steam power) |
Pulverised lignite | |
ABB Winterthur/LAUBAG, HH BEWAG Blankenburger Straße, Berlin | Hot water 8 bar 130°C |
1 | 8 MW - t/h (steam power) |
Pulverised lignite | |
AWA Produktions GmbH Bonn | Dual flame tube Saturated steam 17 bar, 207 °C |
1 | 2x5 MW 12 t/h (steam power) |
Pulverised lignite, change | |
Fernwärme Sörnewitz GmbH, HH Coswig | Saturated steam 12 bar 192 °C |
1 | 7 MW 10,6 t/h (steam power) |
Pulverised lignite | |
Fernwärme Sörnewitz GmbH, HH Radebeul | Hot water 8 bar 130 °C |
1 | 7 MW - t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg / HH Pfleiderer Teisnach | Dual flame tube Saturated steam 13 bar, 195 °C |
1 | 2x7,9 MW 24 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg / HKW MAN Nürnberg | Dual flame tube Saturated steam 20 bar, 215 °C |
1 | 2x10,2 MW 31,2 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Agrarfrost Oschersleben | Dual flame tube Saturated steam 20 bar, 215 °C |
1 | 2x8,9 MW 27,5 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Bio-Ölwerk Magdeburg | Dual flame tube Saturated steam 22 bar 220 °C |
1 | 2x8,9 MW 27 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Brökelmann Hamm | Saturated steam 22 bar 220 °C |
2 | 8,9 MW 13,5 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Diepholz | Saturated steam 22 bar 220 °C |
2 | 8,9 MW 13,5 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH Alsa Töging | Saturated steam 8 bar 175 °C |
1 | 5,3 MW 8,3 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH Cordier Jägerthal | Saturated steam 10 bar 184 °C |
1 | 6,7 MW 10,3 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH Cordier Schleipen | Saturated steam 10 bar 184°C |
1 | 13,3 MW 20,5 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH Fülling Dissen | Saturated steam 22 bar 220 °C |
1 | 13,5 MW 20,5 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH Humana Herford | Saturated steam 16 bar 204 °C |
1 | 10,5 MW 16 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH Novel ferm, Dettmannsdorf | Saturated steam 10 bar 184°C |
1 | 10,4 MW 16 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH Schönfelder Papier | Superheated steam / electricity Superheater 23,5 bar 400 °C |
1 | 11,3 MW 14,5 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg HH TSB Mönchengladbach | Dual flame tube Saturated steam 20 bar, 215 °C |
1 | 2x7,4 MW 22,6 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Knauf Gips KG Lochau | Saturated steam 13 bar 195 °C |
1 | 12,4 MW 19 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Monzingen | Steam boiler 10 bar 184 °C |
1 | 6 MW 10 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Papierfabrik Hainsberg | Superheated steam Superheater 22 bar, 350 °C |
1 | 12,1 MW 16 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg Sprick Diemelstadt | Dual flame tube Superheater 21 bar, 217 °C |
1 | 2x7,3 MW 22 t/h (steam power) |
Pulverised lignite | |
Getec AG, Magdeburg/ HH Resopal, Groß-Umstadt | Saturated steam 13 bar 188°C |
1 | 13,6 MW 23,5 t/h (steam power) |
Pulverised lignite | |
König Brauerei KG, Duisburg | Saturated steam 8 bar 175 °C |
1 | 7,8 MW 12 t/h (steam power) |
Pulverised lignite natural gas | |
Lausitzer Braunkohle AG, Tagebau Jänschwalde | Hot water 8 bar 130 ° C |
1 | 5 MW - t/h (steam power) |
Pulverised lignite | |
Lausitzer Braunkohle AG, Tagebau Reichwalde | Dual flame tube Hot water 8 bar, 140 °C |
1 | 2x3,5 MW - t/h (steam power) |
Pulverised lignite | |
Lausitzer Braunkohle AG, Tagebau Reichwalde | Hot water 8 bar 140 ° C |
1 | 3,5 MW - t/h (steam power) |
Pulverised lignite | |
Pfleiderer Teisnach GmbH & Co.KG, Teisnach | Superheated steam 80 bar 520 ° C |
1 | - MW 40 t/h (steam power) |
Pulverised lignite change | |
Stadtversorgung Löbau GmbH, Löbau | Hot water 10 bar 140 ° C |
1 | 3,5 MW - t/h (steam power) |
Pulverised lignite | |
Stadtwerke Oberland GmbH, Neugersdorf | Superheated steam Superheater 13 bar, 350 °C |
1 | 8 MW 10,7 t/h (steam power) |
Pulverised lignite | |
Stadtwerke Strausberg GmbH, Strausberg | Hot water 8 bar 130 ° C |
1 | 6 MW - t/h (steam power) |
Pulverised lignite | |
Steinkohlenbergwerk Sophia-Jacoba, Hückelhoven | Hot water 5 bar 120 ° C |
3 | 0,7 MW - t/h (steam power) |
Mix lignite - anthracite |